Our Work
Our experience in Infrastructure, Warehouse and Hospitality for technical consultancy, design, installation and commissioning.
AC by Marriott
Coordinated and oversaw activities required to secure and implement permanent power supply for the Marriott Ogle project, including liaising with utility providers, managing technical requirements, and ensuring compliance with installation standards to enable reliable and continuous operations.
Cevon’s New Office Facility
Developing comprehensive MEPF solutions—covering HVAC, electrical distribution, lighting, water supply, drainage, and fire protection—integrated with an advanced BMS for centralized monitoring and control. In addition to the design, MEP Engineering Services is supervising the installation works to ensure all systems are implemented in full alignment with the approved designs, specifications, and industry standards, delivering a modern, efficient, and compliant facility for Cevon’s operations.
Guyana Forensic Science Laboratory
Designed and supervised HVAC systems to ensure optimal performance and compliance to AHSRAE Standards for Laboratory.
Guyana Marriott Hotel (Georgetown)
Project Administrator for the replacement of a 246 kw modular chiller.
GUYSUCO
Providing full design and installation of fire alarm systems for GuySuCo facilities, including system layout, equipment specification, and integration to meet safety codes and regulatory requirements. Overseeing installation to ensure optimal functionality, reliability, and compliance with fire safety standards.
Ministry of Agriculture – Guyana School of Agriculture
Executing the design and implementation of electrical system upgrades for the Guyana School of Agriculture, including upgrading wiring, panels, and distribution systems to meet current safety codes, improve capacity, and enhance operational efficiency. Oversaw installation to ensure compliance with technical specifications and regulatory standards.
Ministry of Agriculture – Onverwagt Electrical Grid
Designed, installed, and commissioned the electrical grid at Onverwagt for the Ministry of Agriculture, delivering a reliable power distribution system to support operational needs. Scope included system planning, equipment specification, installation oversight, testing, and final commissioning to ensure compliance with safety regulations and optimal performance.
VSH Warehouse
Full design and supervision services for the mechanical, electrical, plumbing, and fire protection (MEPF) systems for a new industrial facility.
Wendy’s Guyana Restaurants
Full design, supervision and installation of Mechanical, Electrical, Plumbing, and Fire Protection (MEPF) systems for a local branch of the international fast-food franchise.
